INFLATABLE BOATS SHIP FREE IN THE LOWER 48 STATES!

LITE SKIFF AIR INSTRUCTIONS

Package contents:

13ft LITE SKIFF AIR

Tote Bag

Bench

6 Tie Downs (2 grab bar base plate and 4 for front deck)

Air Pump

Repair Kit

Front Deck

Base Plate and Grab Bar with Locking Pins

 

The front two slots are designed to prevent side to side movement. DO NOT OVERTIGHTEN ! Optional for use of platform.

The large rear strap points secure to the D-rings located on the interior tubes. Required for use.

The large middle strap point is the best for high strength binding and the preferred front strapping point.

Attach grab bar to the base plate by sliding is over top of the base plate posts. Insert the two included pins to lock the grab bar in place.

Use the horizontal tube on the grab bar to secure the fixture to the D-ring installed on the boat floor.

 

Line the two half circle cutouts with the two D-rings located in the center of the boat floor. Run the provided strap through both D-rings and overtop of the base plate to secure it to the floor.

For mounting your cooler, first use the rear cutout to secure the cooler to the base plate. Use the closest cutout to the front of the cooler to secure it to the base plate.

See capacity plate on transom for inflation pressures. 

Slightly inflate the floor first. Install the floor within the raft making sure the floor valve is centered with the drain plug on the transom. Once the floor is in place, fully inflate the floor.

Once the floor is installed, inflate the main tubes if the raft to at least 3.25 psi. As the tubes inflate press the floor down to secure the floor below the tubes.   

Additional tie downs can be purchased to secure your cooler, gas tanks, or batteries. 

The NRS Bravo pump is also available for faster inflation. 

BACK TO TOP